Correct installation procedure of hydrocyclone group

Author: Time: April 2, 2020 91 views

   Hydrocyclone Group is the combination of hydrocyclone equipment, which needs strict installation steps to be able to be used normally in the later stage. We should know that the separation ability of hydrocyclone group is relatively strong and the solid content of underflow is high, so we should pay attention to the installation.

1. Erection position of hydrocyclone group:

Attention should be paid to the starting point of the hydrocyclone group when it is installed. The starting point of the dam should be the far point of the tailings dam, and the desilting nozzle of the hydrocyclone must also face the far point of the dam. After the hydrocyclone works for a period of time, the underflow dam can move along the dam and continue to pile.

2. The problem of underflow stacking height:

In the design and installation of hydrocyclone group, the height of water flow must be considered clearly. Generally speaking, the bottom flow can not be blocked.

 Jpg

3. Mobility after installation:

Therefore, it is necessary to move the hydrocyclone from the starting point to the end of the dam. One thing to note is to keep the same horizontal separation distance when moving.

4. Matching feed pipe of hydrocyclone group:

The length of the feed pipe of the hydrocyclone group shall meet the sufficient standard, and it shall be judged according to the actual situation of the equipment at the time of installation. In addition, the requirement for the feed pipe of the hydrocyclone group is that the corrosion resistance can be enhanced.

The correct installation of hydrocyclone Group determines the normal use of the later equipment, so if you have any questions about the above installation introduction, you can consult our manufacturer. Do not operate blindly without understanding, so as to avoid the equipment not working normally due to abnormal installation in the later stage.